Public Participation in Environmental Impact Assessment of Phase I Project of 285000 Tons of Nitric Acid and 100000 Tons of Boric Acid Production Plant of Shandong Huayang Deere Chemical Co., Ltd. First Publicity


Published on:

2021-12-16

Shandong Huayang Deere Chemical Co., Ltd. is a joint-stock enterprise specializing in the production of concentrated nitric acid and dilute nitric acid. The company was established in May 2001 and is located in "Shandong Ningyang Chemical Industry Park" (formerly Ningyang County Biochemical Base) in Ciyao Town, Ningyang County. Its original registered name was "Ningyang Deer Chemical Co., Ltd." in 2003, it was expanded and restructured and renamed "Shandong Huayang Deer Chemical Co., Ltd.", referred to as "Deer Chemical". The company's registered capital was 86.76 million yuan and was listed on the new third board on November 10, 2014 (stock code: 831304).

Name and Summary of 1. Construction Project
Project Name: 285000 Tons of Nitric Acid and 100000 Tons of Boric Acid Production Plant Project Phase I
Construction unit: Shandong Huayang Deer Chemical Co., Ltd.
Construction site: Ningyang Chemical Industry Park in Shandong Province (formerly Ningyang County Biochemical Industry Base)
Shandong Huayang Deere Chemical Co., Ltd. is a joint-stock enterprise specializing in the production of concentrated nitric acid and dilute nitric acid. The company was established in May 2001 and is located in "Shandong Ningyang Chemical Industry Park" (formerly Ningyang County Biochemical Base) in Ciyao Town, Ningyang County. Its original registered name was "Ningyang Deer Chemical Co., Ltd." in 2003, it was expanded and restructured and renamed "Shandong Huayang Deer Chemical Co., Ltd.", referred to as "Deer Chemical". The company's registered capital was 86.76 million yuan and was listed on the new third board on November 10, 2014 (stock code: 831304). Shandong Huayang Deere Chemical Co., Ltd. Deere Chemical Co., Ltd. has 165 employees. The existing 135000-ton/year double-pressure loading was put into production in 2005, covering an area of 90.97 mu. The plant has been in good condition since its start-up, and the output of concentrated nitric acid ranks among the top three in China. Deere Chemical has a wholly-owned subsidiary-Shandong Fortune Chemical Co., Ltd., which was established on November 22, 2006 with a registered capital of 20 million yuan. It is located on the east side of Deere Chemical, across from Deere Chemical. Shandong Fortune Chemical Co., Ltd. currently has 1 set of 20000 tons/year potassium nitrate device, 1 set of 5000 tons/year magnesium nitrate device and 1 set of 50000 tons/year high potassium nitro water soluble fertilizer device. The company's products are in line with the national industrial policy, enjoy the preferential policy of local tax return, and are the enterprises supported by the local government.
The company's existing 135000 tons/year nitric acid production plant adopts the domestic advanced double pressure production process, advanced technology, low production cost, has been in full capacity production state. The device adopts indirect production process, that is, dilute nitric acid is first produced, and then concentrated to obtain concentrated nitric acid. Shandong fortune chemical co., ltd. needs 60% dilute nitric acid as raw material to produce nitrate series products. therefore, part of the dilute nitric acid produced by the existing project of Shandong huayang dier chemical co., ltd. is used to concentrate concentrated nitric acid and part is transported to Shandong fortune chemical co., ltd. through pipelines to produce nitrate series products. currently, Shandong fortune chemical co., ltd. uses about 40000 tons/year of dilute nitric acid.
In recent years, with the continuous development of the subsidiary fortune chemical nitrate series products, the internal consumption of dilute nitric acid is increasing, which has been difficult to meet the company's production and operation requirements. In order to adjust the product structure of the enterprise and extend the industrial chain of nitric acid, Shandong Huayang Deer Chemical Co., Ltd. plans to invest 410.6685 million yuan to build a 285000-ton nitric acid and 100000-ton boric acid production plant project in Ningyang Chemical Industrial Park, Shandong Province. The project is divided into two phases. The first phase of the project has a total investment of 0.308 billion yuan and a 285000-ton/year nitric acid production plant. The scope of this environmental impact assessment is the first phase of the project. The first phase of the project includes two sets of nitric acid production units, which will be built in two factory areas-a new 135000-ton/year full medium pressure nitric acid unit will be built on the open space of the existing old factory area, covering an area of 2600 m2, and its supporting public works facilities will be provided by the existing factory area; In the new land acquisition and construction of the new factory area, a new 150000-ton/year double pressure nitric acid unit will be built, covering an area of 120000 m2, its supporting public works facilities are all newly built. This project does not belong to the restricted and eliminated projects in the National Development and Reform Commission's "Industrial Structure Adjustment Guidance Catalog (2021)", and the company is responsible for the authenticity of the project.
Name and contact information of 2. construction unit
Construction unit: Shandong Huayang Deer Chemical Co., Ltd.
Contact address: Ningyang Chemical Industry Park, Shandong Province (formerly Ningyang County Biochemical Base).
Contact: Zhu Lisheng
Telephone: 15169817658
E-mail: 15169817658@163.com
3. name and contact information of the environmental impact assessment agency undertaking the assessment work
Evaluation Unit: Shandong Rudi Environmental Technology Co., Ltd.
Contact: Zhao Hui
Contact number: 15269877587
E-mail: china_eia_report@163.com
Web Links to 4. Public Comments Form
http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html
Working Procedures and Main Work Contents of 5. Environmental Impact Assessment
1. Working procedures include:
(1) Preparation stage: study relevant documents, conduct environmental status surveys, screen key evaluation projects, and determine the level of evaluation work.
(2) Formal work stage: further engineering analysis and status investigation and monitoring, and environmental impact prediction and evaluation.
(3) Preparation of the report stage: summarize information and data, put forward environmental protection measures and suggestions, give conclusions, and complete the preparation of the report.
2. The main work contents include:
(1) Engineering analysis: Introduce the general situation of the project, the environmental situation of the project construction site and the environmental protection objectives, analyze the impact of the project implementation process on the environment and its evaluation at different stages, and put forward environmental protection suggestions and measures.
(2) Conformity analysis with relevant planning: analyze the opinions of governments at all levels, planning and environmental protection departments where the project is located.
(3) Current situation of environmental quality: monitor and evaluate the current situation of environmental quality in the construction area in accordance with the requirements of national laws and regulations.
(4) Environmental impact prediction: predict the main environmental factors of the construction project and evaluate the prediction results.
(5) Ecological protection measures: put forward reasonable and feasible measures and countermeasures to control pollution and protect the ecological environment, so as to control and reduce or reduce the negative impact caused by the construction of the project to the maximum extent.
(6) Public participation: public participation shall be conducted by means of public participation such as environmental information announcement and public opinion survey, and the feedback of public participation shall be reflected in the EIA, and the conclusion of adoption or non-adoption shall be given.
(7) Put forward the conclusion of environmental impact assessment: put forward the conclusion of environmental impact assessment on the basis of the above work.
Main matters 6. soliciting public opinions
Whether the Project will aggravate the pollution to the local environment;
③The attitude of taking mitigation measures for the project; ④The effect of the construction of the project on the local economic development;
⑤ Whether the project is supported or not; ⑥ Other opinions or suggestions on environmental protection of the project.
Main ways of 7. public input
(1) Within ten days from the date of the announcement, the construction unit or the entrusted environmental impact report preparation unit shall provide the public with the inquiry and inspection services of relevant materials.
(2) If the public has environmental protection opinions on the construction project, they can express their opinions to the construction unit or the environmental impact report preparation unit by telephone, letter or E-Mail within ten days from the date of this announcement, or they can express their opinions. Form a written text and send it to the local environmental protection authority.